EXPERIMENTAL INVESTIGATIONS OF PIPELINE FILLING AND EMPTYING IN A SMALL-SCALE APPARATUS

  • Uroš Karadžić Faculty of Mechanical Engineering, University of Montenegro
  • Anton Bergant Litostroj Power d.o.o.
Keywords: pipeline, filling, emptying, instrumentation, esults of measurements

Abstract

This paper serves as a reference for further investigations of pipeline filling and emptying in a relatively small-scale pipeline apparatus. The apparatus consists of an upstream end high-pressurized tank, horizontal steel pipeline, four valve units positioned along the pipeline including the end- points, and a downstream end tank. The filling of an initially empty pipeline is performed by a sudden opening of the valve positioned at the high-pressurized tank filled with water. The pipeline- emptying process is accomplished by high-pressurized air supplied from the air reservoir installed at the high-pressurized tank. The high-pressurized tank is closed, and the downstream end valve is opened. Experimental results indicate that pressure fluctuations are larger for pipeline filling in comparison to pipeline emptying. It is shown that a piezoelectric transducer with a fixed relatively low discharge time constant is not entirely appropriate for accurate low-frequency pressure mea- surements.

Downloads

Download data is not yet available.

References

Q. Hou, et al.: Experimental study of filling and emptying of a large‐scale pipeline, CASA Report 12‐15, Eindhoven University of Technology, The Netherlands, p.p. 1‐40, 2012

A. Malekpour, B.W. Karney: Profile‐induced column separation and rejoining during pipeline filling, Journal of Hydraulic Engineering, ASCE, Vol. 140, Iss. 11, p.p. 040140541‐12, 2014

J.G. Vasconcelos, S.J. Wright, M. Guizani: Experimental investigations on rapid filling of empty pipelines, Report UMCEE‐05‐01, University of Michigan, Ann Arbor, USA, p.p. 1‐ 53, 2005

J. Laanearu, et al.: Emptying of large‐scale pipeline by pressurized air, Journal of Hydraulic Engineering, ASCE, Vol. 138, Iss. 12, p.p. 1090‐1100, 2012

Q. Hou, et al.: Experimental investigation on rapid filling of a large‐scale pipeline Journal of Hydraulic Engineering, ASCE, Vol. 140, Iss. 11, p.p. 040140531‐14, 2014

U. Karadžić, V. Bulatović, A. Bergant: Valve‐induced water hammer and column separation in a pipeline apparatus, Strojniški vestnik – Journal of Mechanical Engineering, Vol. 60, Iss. 11, p.p. 742‐754, 2014

U. Karadžić, F. Strunjaš, A. Bergant, R. Mavrič, S. Buckstein: Developments in pipeline filling and emptying experimentation in a laboratory pipeline apparatus, 6th IAHR Meeting of the Working Group Cavitation and Dynamic Problems in Hydraulic Machinery and Systems, Ljubljana, Slovenia, 2015

H.W. Coleman, W.G. Steele: Experimentation and Uncertainty Analysis for Engineers. John Wiley and Sons, 1989

Published
2024-02-01
How to Cite
Karadžić U., & Bergant A. (2024). EXPERIMENTAL INVESTIGATIONS OF PIPELINE FILLING AND EMPTYING IN A SMALL-SCALE APPARATUS. Journal of Energy Technology, 11(2), 11-22. https://doi.org/10.18690/jet.11.2.11-22.2018

Most read articles by the same author(s)