NUCLEAR ENERGY AS A FUTURE DIRECTION IN SLOVENIA
Abstract
Based on a recently completed energy/electricity forecast, Slovenia will need new electricity generation capacities. In order to ensure sustainable development for the national economy, bearing in mind
environmental constraints (Kyoto Protocol), the EU energy and climate package, and the reliable and safe supply of electricity, the nuclear option seems to be the most plausible one to
match all mentioned requirements. Furthermore, the Slovenian Ministry of the Economy is preparing the National Energy Program (NEP) in which the nuclear energy is recognized as one of the possible options for future development. In recent years, the supply of electricity in Slovenia has been under high demand, due to two main factors. The first is the lack of investment initiatives in new electricity generation capacity.
The second is the growth of the gross domestic product (GDP) in Slovenia and consequent increase of the domestic electricity consumption. This situation changed slightly in 2008 with the onset of the current economic crisis, which led to less demand for the electricity. However, this situation must not be used as an excuse to do nothing. It is obvious that the lack of electricity will be only postponed for some years.
GEN energija started with the project of new nuclear power plant in the beginning of 2006 and has completed the pre-preparation phase. Many studies and analysis were performed during this initial phase, and all results confirm good harmony with the philosophy of sustainable development, in which ecological, economical and social effects of the project have to be balanced. The studies covered four main areas: analysis of development possibilities in the field of electricity supply in Slovenia, environmental impacts of different technologies, technology itself as well as economic and financial effects of the new nuclear power plant (NPP). All studies were performed by well-regarded foreign and Slovenian institutions, research organisations and companies. The main conclusions based on these studies confirm the justification and technical
feasibility of the project. The planning of such major projects is of the greatest significance, especially for a new NPP. Therefore, the licensing process with main players is also described and depicted.
Downloads
References
Resolucija o nacionalnem energetskem programu ReNEP, Uradni list Republike Slovenije Št. 57/2004.
Zelena knjiga za Nacionalni energetski program, Ministrstvo za gospodarstvo, Ljubljana, april 2009.
New Nuclear Power Plant in Slovenia, Journal of Energy Technology, Vol. 1, 2008.
Bela knjiga, ELEK, Ljubljana, 2009.
Analiza razvojnih možnosti, Elek, Ljubljana, 2008.
Conceptual design of Krško 2 NPP, IBE, Ljubljana, 2009.
Feasibility Study and Optimisation of Cooling Towers for the New NPP at the Krško Site, SPX, Ratingen, 2009.
Study on Waste Heat Utilization of the New Nuclear Power Plant Krško 2, Imuthes, Gradz, 2008.
Vključitev novega elektroenergetskega objekta JEK 2 v EES Slovenije - 1. del, študija št. 1873.
Možnost vključitve novega elektroenergetskega objekta JEK 2 v EES Slovenije - 2. del - Dinamične analize, študija št. 1873/2.
Transport Feasibility of Equipment to the Foreseen Location of New Nuclear Unit, Transing, Ljubljana, 2009.
Preliminary Report on Environmental Impacts of Different Energy Technology Options for Slovenia, WSMS-OPS-09-0001, URS/Washington Division, USA, 2009.
Makroekonomski učinki gradnje in delovanja JE Krško 2, Ekonomski institut pravne fakultete, Ljubljana, 2008.
Uredba o enotni metodologiji za pripravo in obravnavo investicijske dokumentacije na področju javnih finance, Uradni list RS 60/2006.
Predinvesticijska zasnova, HSE Invest, Maribor, 2008.
Revizija Predinvesticijske zasnove, IBE, Ljubljana, 2010.