[1]
R. Pušenjak and M. Oblak, “Control of production system with production delays by means of Lambert functions”, analipazu, vol. 7, no. 1-2, pp. 26–34, Jun. 2022, doi: 10.18690/analipazu.7.1-2.26-34.2017.